1. Electricity quality monitoring sector
A. PQube3 web service screen description: https://youtu.be/OURel47scYo
B. How to write a Configurator to run PQube3 Video :
- Quick Start Video: https://youtu.be/IcwM4wTI-Yk
- How to write general information video 1: https://youtu.be/BVC_WzyXKWA
- How to set LOAD definition video: https://youtu.be/EMpUfYHhm-0
- Setting method for AC voltage trigger 1: https://youtu.be/9rZALM2498c
- How to set up AC current CT: https://youtu.be/oBK5dq9f7cg
- Setting method for AC current trigger: https://youtu.be/ykLyVzrFFdE
- Setting method for voltage and current harmonic monitoring: https://youtu.be/e79ljc-w8BY
- How to save event data to USB: https://youtu.be/WW66ThUcG9c
- How to download FTP event data all at once: https://youtu.be/DsQ3GKSZOm8
- How to receive events by email: https://youtu.be/63A2T3MHi88
- How to update firmware and setup.ini: https://youtu.be/KmiVJDEREPw
2. Earth leakage analysis and inspection, safety sector
* Purpose: This product was developed to measure the insulation resistance in the live state of a single-phase power supply.
A. Description of operation of IGR earth leakage analyzer (JS-2020 new, high precision) : https://youtu.be/y-meShFiB_8
B. Description of operation of IGR earth leakage analyzer (JS-2010HT old): https://youtu.be/dBzlObURym0
C. Earth leakage tester ( JS-0608T ) operation description: https://youtu.be/uRCt1F4VqtY
D. Online wattage meter for both live insulation resistance measurement (JS-LEMS312G) operation description: https://youtu.be/95o4PwXSl6U
E. IoT earth leakage alarm sensor: https://youtu.be/sPEHio3UpNU
F. Description of operation of AC leakage fault detection device (WSD-350): https://youtu.be/1BkGMI20g44
* Purpose: When a circuit breaker trips in case of a cable leakage in a street light, quickly finds it and installs a temporary cable to temporarily supply street light lighting.
Replace the underground cable with a gap.
3. Earth leakage breaker field
A. Active ingredient operation type operation and unnecessary operation prevention type (in case of instantaneous leakage current) operation test of single-phase IGR earth leakage breaker
: https://youtu.be/Dqy8PJy3PNA
- Including a description of the technology roadmap in the field of leakage analysis and interruption.
- The instantaneous leakage current proves that it is a leakage component of the pure capacitance component, and an IGR earth leakage circuit breaker is used.
- Communication company repeater, LED traffic signal controller, and earth leakage breaker for rural village refrigerator tripped due to instantaneous capacitive leakage current generated during lightning strike, but IGR
Solved after using a ground leakage breaker.
B. Operation test of 3-phase IOP earth leakage breaker to prevent unnecessary operation: https://youtu.be/vNROwh8-pac
C. Mutual cooperative operation test between single-phase and three-phase earth leakage breaker : https://youtu.be/Ox9nxZqnfEM
* Conclusion: A single-phase earth leakage breaker must trip earlier than a 3-phase earth leakage breaker for protection coordination
become inappropriate)
* Protection coordination is perfect only when a combination of a single-phase IGR earth leakage breaker and a 3-phase IOP earth leakage breaker is used.
D. Earth Leakage Alarm Circuit Breaker (IGR-32i: Earth Leakage Alarm LED Display Type IGR Earth Leakage Circuit Breaker) Operation Test: https://youtu.be/gIwI8EUm2Tw
4. Storage battery monitoring and discharge test sector
A. Description of the online storage battery cell monitoring system (cell scan) monitoring screen: https://youtu.be/_X3BJUfUorc
* Core function: Ripple current measurement function during floating charge, real-time monitoring during discharge, and playback function after saving.
B. Battery capacity test through 1-second instantaneous discharge using B-BEST equipment: https://youtu.be/f22JJ2qhBPM
- Video made in Japan1. : https://youtu.be/LG7xa7uz9_Q
- Video made in Japan 2: https://youtu.be/yQ5CWPchaCc
- Video 3 made in Japan : https://youtu.be/cYf2F9Y7mkc